Description
ARCGIS:- BECOME A GIS ENGINEER 1.INTRODUCTION TO ARCGIS 2.DATA MANAGEMENT (RASTER DATA,VECTOR DATA,GEODATABASE,SHAPEFILES AND ATTRIBUTE QUERY) 3.MAPPING AND VISUALIZATION(STYLING,MANAGING AND DISPLAYING LAYER) 4.RASTER DATA ANALYSIS(SLOPE,HILLSHADE AND DEM) 5.VECTOR DATA ANALYSIS(INTERSECT,BUFFER,UNION AND CLIP) 6.GEO-STATISTICAL ANALYSIS TECHNIQUE(SPATIAL ANALYSIS AND NETWORK ANALYSIS AUTOCAD:- 8.ADVANCED DRAWING & MODIFYING TOOLS:- (i)POLYGON,ELLIPSE,ARC,POINT,POINT STYLE,DIVIDE,MEASURE,REGION,REVISIONCLOUD,WIPOUT,HATCH,GRADIENT,BOUNDARY (ii)STRETCH,FILLET,CHAMFER,EXPLODE,RECTANGULAR ARRAY,PATH ARRAY,POLAR ARRAY 9.ANNOTATION (I)SINGLE LINE TEXT,MULTILINE TEXT,EDIT TEXT,TABLE,TEXT STYLE,TABLE STYLE 10.UTILITIES (i)MEASURE DISTANCE,RADIUS,ANGLE,AREA 11.BLOCK (i)MAKE A BLOCK.INSERT BLOCK,WRITE A BLOCK 12.LAYERS (i)CREATING LAYERS,DELETING LAYERS,LAYERS ON & OFF,LAYER FREEZE,LAYER LOCK,COPYING A LAYER TO OTHER FILE 13.INSERT (i)IMPORT IMAGES,OLE OBJECT,HYPERLINK,EXT REFERENCE 14.ISOMETRIC (i)ISOMETRIC SNAP,ISOMETRIC PLANES,ISOMETRIC CIRCLE 15.BASIC DIMENSIONS (i)LINEAR,ALIGNED,ANGULAR,ARC LENGTH,RADIUS DIAMETER,JOGGED RADIUS,ORDINATE 16.ADVANCED DIMENSIONS (i)CONTINUE,BASELINE,BREAK,SPACE,JOG LINES,CENTER MARK,OBLIQUE,MULTILEADER,MULTILEADER STYLE,ALIGN TEXT PROJECT:- G+2 BUILDING PROJECT HIGHWAY ENGINEERING:- 1.INTRODUCTION TO HIGHWAY ENGINEERING 2.COMPONENT OF HIGHWAY 3.TYPICAL CROSSECTION OF RIGID PAVEMENT DETAILS 4.PQC ROAD DETAILS,LAYERS USED FOR PQC ROAD ,DLC & PQC 5.TYPICAL CROSS SECTION OF HIGHWAY ROAD 6.TCS OF TWO LANE FLEXIBLE PAVEMENT 7.TCS OF 6-LANE & 4-LANE HIGHWAY 8.PLAN AND PROFILE DETAILS OF ROAD,L-SECTION OF ROAD 9.PLAN AND PROFILE OF HIGHWAY 10.HOW TO CHECK PERCENTAGE OF CAMBER IN ROAD 11.FRL & LEVELS DETAIL OF HIGHWAY PROJECT,CHAINAGE,FRL,CAMBER PERCENTAGE,WIDTH OF DIFFERENT LAYERS 12.CALCULATION OF REDUCE LEVEL(RL) OF DIFFERENT LAYERS OF HIGHWAY WITH THE HELP OF FRL OF HIGHWAY 13.HOW TO FIND CUTTING & FILLING IN SUBGRADE 14.HIGHWAY CONSTRUCTION STEPS 15.WHAT IS THE USE OF OGL IN HIGHWAY CONSTRUCTION,WHAT IS OGL RECORDING 16.HOW TO CALCULATE WIDTH OF ROAD LAYERS 17.HOW TO CALCULATE WIDTH OF ROAD LAYERS SUBGRADE 18.HOW TO CALCULATE WIDTH OF ROAD LAYERS GSB 19.HOW TO CALCULATE WIDTH OF ROAD LAYERS WMM 20.HOW TO CALCULATE WIDTH OF ROAD LAYERS DBM 21.HOW TO CALCULATE WIDTH OF ROAD LAYERS BC 22.SUBGRADE FIRST LAYERWORK,SUBGRAGE PREPARATION WORK 23.BENCHCUTTING,GSB DUMPING,GRADING GSB 24.SPECIFICATION & TESTS OF BASE COURSE OF FLEXIBLE PAVEMENT,WMM TOP LAYER 25.EMBANKMENT DETAIL,EMBANKMENT OF ROAD,HIGHWAY CONSTRUCTION,TEST INVOLVED,TEST LIMIT AS PER MORTH 26.EMBANKMENT & SUBGRADE DETAIL OF HIGHWAY,EARTHWORK DETAIL OF HIGHWAY 27.ORIGINAL GROOUND LEVEL(OGL) OF ROAD,LEVEL PLACING FOR SUBGRADE TOP LEVEL 28.WET MIX MACADAM (WMM) TOP LAYER PREPARATION PROCESS,LEVEL PLACING FOR WMM TOP LAYER,LEVEL PLACING FOR WMM BED 29.PRIME COAT.TACK COAT,DBM DETAIL 30.DBM TECHNICAL SPECIFICATION,GRADE OF DBM,GRADE OF BITUMEN,LAYING & ROLLING TEMPERATURE OF ASPHALT ROAD 31.DBM LAYING PROCESS,DENSE BITUMINOUS MACADAM LAYING WITH SENSOR PAVER,SENSOR PAVER V/S MAHENICAL PAVER 32.BITUMINOUS CONCRETE DETAIL.MORTH 33.HOT MIX PLANT DETAIL,DBM BATCHING PLANT SETUP DETAIL,CONSTRUCTION EQUIPMENT 34.SUB BASE COURSE OF FLEXIBLE PAVEMENT,GSB-GRANULAR SUB BASE OF ROAD/HIGHWAY ,TEST FOR GSB 35.BASE COURSE OF FLEXIBLE PAVEMENT SPECIFICATION 36.EMBANKMENT OF ROAD/HIGHWAY CONSTRUCTION,TEST LIMIT AS PER MORTH 37.SUBGRADE LAYER OF ROAD /HIGHWAY FOR BOTH FLEXIBLE AND RIGID PAVEMENT 38.QUANTITY CALCULATION OF SUBGRADE ,GSB,WMM 39.EARTHWORK QUANTITY CALCULATION OF ROAD WORK,SUBGRADE QUANTITY CALCULATION,SLOPE CALCULATION,RIGID PAVEMENT DRY LEAN CONCRETE(DLC)DETAIL SPECIFICATION 40.PAVEMENT QUALITY CONCRETE(PQC) DETAIL SPECIFICATION 41.DOWEL BARS MORTH SPECIFICATION 42.RIGID PAVEMENT CONSTRUCTION PROCESS WITH SLIP FORM PAVER 43.QUANTITY CALCULATION OF FLEXIBLE PAVEMENT BRIDGE ENGINEERING:- 1.INTRODUCTION OF BRIDGE,COMPONENTS OF BRIDGE 2.RE WALL CONSTRUCTION PROCESS WITH DRAWING ,HOW TO MAINTAIN RE WALL SLOPE 3.HOW TO START RE WALL EXCAVATION,RE WALL PANEL CONCRETE QUANTITY AND REINFORCEMENT DETAIL 3.HOW TO CALCULATE PSC GIRDER CONCRETE QUANTITY,HOW TO PREPARE PSC GIRDER (BBS) BAR BENDING SCHEDULE 4.HOW TO PREPARE PIER CAP BBS 5.HOW TO CALCULATE LINK BAR QUANTITY 6.HOW TO PREPARE MAJOR BRIDGE BBS ABUTMENT BBS (BAR BENDING SCHEDULE 7.HOW TO PREPARE RETAINING WALL BAR BENDING SCHEDULE 8.HOW TO PREPARE BAR BENDING SCHEDULE OF PIER 9.HAUNCH BAR CUTTING LENGTH CALCULATION 10.HOW TO PREPARE CRASH BARRIER BAR BENDING SCHEDULE 11.MESH REINFORCEMENT CUTTING LENGTH 12.CRASH BARRIER CONCRETE QUANTITY CALCULATION 13.APPROACH SLAB REINFORCEMENT DETAIL WITH BAR BENDING SCHEDULE 14.HOW TO PREPARE FRICTION SLAB BAR BENDING SCHEDULE 15.CALCULATION FOR CHAIR AND SPACER CUTTING LENGTH 16.SHEAR KEY CUTTING LENGTH CALCULATION 17.HOW TO CALCULATE BOX CULVERT BRACKET BAR CUTTING LENGTH,BOX CULVERT BAR BENDING SCHEDULE 18.HOW TO MEASURE PIER CAP BAR BENDING SCHEDULE 19.MAJOR BRIDGE PEDESTAL BAR BENDING SCHEDULE AND STEEL DETAILS 20.CALCUALTION OF HAUNCH BAR 21.HOW TO PREPARE BOX CULVERT BAR BENDING SCHEDULE 22.HOW TO CALCULATE NUMBER OF LINKS BAR IN BOX CULVERT 23.BOX CULVERT WALL QUANTITY ESTIMATE,BOX CULVERT SLAB QUANTITY 24.How to calculate PSC GIRDER CONCRETE QUANITY 25.HOW TO CALCULATE QUANTITY OF PIPE CULVERT 26.CRASH BARRIER CONCRETE QUANTITY CALCULATION 27.HOW TO PREPARE PIER CAP MATERIAL ESTIMATE 28.RETAINIG WALL CONCRETE QUANTITY CALCULATION 29.HOW TO CALCULATE FRICTION SLAB QUANTITY,HOW TO PREPARE FRICTION SLAB BAR BENDING SCHEDULE 30.BRACKET WALL CUTTING LENGTH CALCULATION 31.HOW TO CALCULATE STONE PITCHING QUANTITY 32.PILE CAP BAR BENDING SCHEDULE 1.BILLING ENGINEER ROLES & RESPONSIBILITIES 2.DUTIES AND RESPONSIBILITIES OF A BILLING ENGINEER 3.WHAT IS BOQ 4.TYPES OF BOQ IN CONSTRUCTION 5.RA BILL,VENDOR BILL,SUPPLIER BILL,RECONCILLATION 6.BILLING ENGINEER TASKS AT SITE OFFICE AND UNDERSTANDING THE ROLE IN HEAD OFFICWE WITH THE CLIENT COORDINATION 7.ACCOUNT BASICS REQUIREMENT FOR BILLING ENGINNER 8.CONSTRUCTION BILLING PROCEDURES FROM CLIENT SIDE AS WELL AS CONTRACTOR SIDE 9.INTERIM PAYMENT CERTIFICATION-CLIENT SIDE AS WELL AS CONTRACTOR SIDE 10.RA BILL MAKING-CLIENT BILLING-SUBCONTRACTING 11.BILLING WITH GST AND WITHOUT GST-HANDS OF EXPERTISE 12.CPWD AND CORPORATIONS AND PSU’S TECHNIQUES OF BILLING 13.INVOICE GENERATION 14.CLAIM AND DISPUTE SETTLEMENT PROCEDURES 15.MATERIAL ENGINEERING BILLS 16.THIRD PARTY CONTRACTOR BILLING 17.JOINT VENTURE COMPANIES/CONTRACTOR BILLING 18.PETTY/VENDOR BILLING 19.CLAIM MANAGEMENT PROCEDURES USED BY INVOICE ENGINEER 20.CLAIM OF PRICE VARIATIONS-USED BY INVOICE ENGINEERS 21.CLAIM OF QUANTITY VARIATIONS-AS PER NORMS OF GOVT. OF INDIA 22.MODE OF MEASUREMENT 23.CLAIM OF EXTRA ITEM ANALYSIS 24.VENDOR VS.CLIENT BILL 1.TENDERING DOCUMENTS PREPARATION 2.TENDERING DOCUMENTS-SUBMISSION GUIDELINES 3.TENDER REVIEW REPORTS GENERATION(TRR) FOR THE CONTRACTOR AS WELL AS CONSULTANTS 4.TECHICAL BIDDING-AS PER GOVERNMENT LAWS 5.STATUTORY DOCUMENTS –TECHNIQUES FOR THE TENDER 6.FINANCIAL BIDDING-AS PER GOVERNMENT LAWS 7.PURCHASING AND NEGOTIATION TECHNIQUES-USED BY CLIENTS AND AS WELL AS CONTRACTOR’S SIDE 8.PRE-BID MEETING STRATEGY-BUILDING AND COORDINATION WITH CLIENT 9.FINDING DEVIATIONS AND CLARIFY WITH THE CLIENT 10.TENDER HUNTING 11.REVERSE AUCTIONING STRATEGY-BUILDING AND PRESSURIZING CLIENT FOR THE TENDER 12.POOLING TECHNIQUE TO USE EFFECTIVELY FOR THE TENDER TO GET MAXIMIZE BENEFITS 13.EVALUATION STRATEGY-BIDDING STRATEGY –RELATIONSHIP BUILDING 14.INDEMNIFY THE TENDER WITH THE USE OF EFFECTIVE MONITORING OF THE TENDER 15.ENTERING INTO CONTRACTS-STRATEGY BUILDING APPROACH –SCIENTIFIC APPROACH 16.CONSTRUCTION CONTRACTS DOCUMENTS-FORMULATION AND PREPARATION 17.PROCEDURES IN CONTRACT MANAGEMENT-PRE CONSTRUCTION AND POST CONSTRUCTION PHASE 18.CLEARING,FORWARDING AND TRANSPORT 19.TRANSPORT MANAGEMENT 20.INTERPRETATION OF CONTRACTS AND CONTRACT TERMS 21.COST OVERRUN AND TIME OVERRUN-STRATEGY BUILDING APPROACH 22.INDIAN LAWS-FOR CONSTRUCTION CONTRACT MANAGEMENT 24.WORK ORDER PREPARATION 25.LIVE PROJECT TRAINING FOR PROCUREMENT AND NEGOTIATION TECHNIQUES Course Outline of Primavera P6: Chapter-01: INTRODUCTION 1.OVERVIEW OF TEKLA STRUCTURES 2.SOFTWARE DEMONSTRATION MODELLING 1.CREATING A NEW MODEL 2.INSERTING GRIDLINES AND CREATING VIEWS 3.MODELLING STEEL AND CONCRETE STRUCTURAL MEMBERS 4.EDITING STRUCTURAL MEMBERS AND CONNECTIONS 5.INTRODUCTION TO PROFILES MODEL MANAGEMENT 1.INTRODUCTION TO MODEL MANAGEMENT 2.INTRODUCTION TO MODEL ORGANIZER 3.MODEL CHECKING PROCEDURES 4.PHASING AND LOTTING MAINTAINING YOUR SYSTEM 1.INTRODUCTION TO BASIC SYSTEM CUSTOMIZATION 2.SOFTWARE INSTALLATION AND LICENSING 3.TEKLA STRUCTURES OPTION SETTINGS 4.INSTRUCTION ON STORING YOUR CUSTOMISED SETTINGS IN FIRM FOLDERS DRAWING PRODUCTION GA DRAWINGS GENERAL 1.BEST PRACRISES WHEN CONTACTING TEKLA SUPPORT 2.TEKLA ACCOUNT CREATION PROCESS 3.HOW TO UTILISE TEKLA USER ASSISTANCE 4.HOW TO UTILISE TEKLA WAREHOUSE TEKLA STRUCTURES STEEL DETAILING MODELLING 1.MODELLING STEEL MEMBERS 2.USING SYSTEM COMPONENTS 3.MODELLING STAIR,LADDERS AND HAND RAILS 4.CUT IN STEEL MEMBERS 5.IMPORTING AND MODELLING AROUND AN IFC FILE CREATED BY OTHER DESIGN SOFTWARE 6.INSTRUCTION ON HOW TO PUBLISH A MODEL TO TEKLA BIMsight 7.ADDING CONNECTIONS AND BOLT GROUPS 8.FOUNDATION REINFORCEMENT 9.CREATING BASIC CUSTOM COMPONENETS 10.CREATING MODELS WITH REFERENCE TO EXTERNAL DRAWINGS DRAWING PRODUCTION 1.DRAWING SETTINGS 2.GA DRAWINGS 3.ASSEMBLY AND PART DRAWINGS 4.CE MARKING ROLE 5.NUMBERING AND MARKING UP 6.EDITING DRAWINGS 7.CLONING DRAWINGS 8.SUB ASSEMBLIES 9.GENERATING FABRICATION DRAWINGS 10.DRAWING REGISTER ADDITIONAL OUTPUT AND REPORTS 1.COLD ROLLED CAM FILES 2.NC FILES AND REPORTS 3.SECTIONAL REPORTS 4.BOLT AND PLATE REPORTS MODEL MANAGEMENT 1.ADDITIONAL INFORMATION ON MODEL ORGANIZER AND OTHER MODEL MANAGEMENT FUNCTIONALITY 1. INTRODUCTION 2.SURVEY DATA VALIDATION 3.SURFACE ANALYSIS OF GEOMETRY DESIGN 4.MX ROAD BASIC TOLL FOR OPERATION 5.BASIC CONCEPT OF GEOMTERIC DESIGN 6.GEOMETRIC DESIGN 7.GEOMETRIC DESIGN BY ELEMENT METHOD 8.SUPER ELEVATION 9.INPUTS IN MX ROAD FOR HORIZONTAL CORE DESIGN G+2 MANUAL & EXCEL BUILDING DESIGN STAAD PRO 3DS MAX GOOGLE SKETCUP VRAY VAASTU MIX ROAD MIX DESIGN ESCAPE DAILY PROGRESS REPORT TEST REPORT SAFE 1.Software algorithm 2.capabilities of the software 3.strength and weakness of the software 4.SAFE manual 5.significance of menu buttons and icons 6.sample models and templates 7.hands on experience on sample templates MODELLING:PROCESS AND TECHNIQUES 1.Geometry creation process 2.modelling through import methods 3.combined,complex foundation system 4.modelling of foundations,basements,footings and flat slabs 5.property assignment of rigid zones for walls and ramps 6.usage of insertion point for beams and columns 7.property assignment for spring supports 8.uses of design strips 9.definition of post-tensioning in slabs 10.tendon load and its losses 11.loading:dead,live,wind,earthquake,temperature,notional,live load reduction 12.releases,supports,diaphragms,all definition parameters 13.checks on modeling techniques ANALYSIS:PROCESS AND TECHNIQUES 1.Introduction between ETABS and SAFE 2.Soil structure and interaction 3.checks on foundation system BAR BENDING SCHEDULE
PROJECT MANAGEMENT & BIM TECHNOLOGY (REVIT ARCHITECTURE)
MASTER STUDY IN STRUCTURES ETABS
REVIT MEP
REVIT STRUCTURE-CONCRETE AND STEEL
ARCGIS
AUTOCAD
HIGHWAY ENGINEERING
BRIDGE ENGINEERING
BILLING ENGINEER
CONTRACT AND TENDERING
PRIMAVERA
Whati is Project and Project management?
What is Project Life Cycle?
Chapter-02:
History of Project Management
What is Primavera Enterprise & History of Primavera Enterprise?
Chapter-03:
Downloading & Installing of Primavera P6 Software
Launching or Start of Primavera Enterprise?
Chapter-04:Introduction to Primavera Enterprise
Navigating in PE, Starting P6 Logging In, Opening an Existing Project, Open Project Dialog Box, Home Window, Activities Window, Creating a Layout, Opening an Existing Layout, Customizing a Layout, Selecting Columns, Displaying Activity Details, Saving Layouts, Viewing the New Layout, Closing a Project.
Chapter-05:Enterprise Project Structure (EPS)
Enterprise Project Structure, Viewing the EPS, Viewing the EPS in the Projects Window, Creating the EPS, Table View, Chart View, Chart font, and colors.
Chapter-06:Organizational Breakdown Structure (OBS)
Organizational Breakdown Structure/Responsible Manager (OBS), Viewing the OBS/Responsible Managers, Creating OBS, General Tab, Responsible Tab, Table View, Chart View, Chart font, and colors.
Chapter-07:Creating a Project
Creating a Project, Projects Window, Assigning Project Planned start date, Must finish date, Assigning Project calendar.
Chapter-08:Calendars
Global calendar, Resource Calendar, Project Calendar, Creating a Project Calendar, Converting Project Calendar into Global Calendar.
Chapter-09:Work Breakdown Structure (WBS)
Work Breakdown Structure (WBS), Viewing WBS Elements, Adding to the WBS Hierarchy.
Chapter-10:Activities
Adding Activities, Copying Activities, Modifying Activities, DeletingActivities, Activity ID, Adding Duration to Activities.
Chapter-11:Creating Relationships
Predecessors, Successors, Relationship Types: Finish-to-Start (FS), Start-to-Start (SS), Finish-to-Finish (FF), Start-to-Finish (SF), Relationships with Lag, View Relationships in the Gantt Chart, Network Logic Diagram.
Chapter-12:Scheduling
Scheduling a Project, Critical Path Method (CPM) Scheduling, Critical Path, Early Start, Early Finish, Late Start, Late Finish, Total Float, Project Duration.
Chapter-13:Maintaining the Project Documents Library
Creating a Project Document, Assigning a Project Document, AssigningDocument to Activity.
Chapter-14:Assigning Constraints
Commonly Used Constraints: Must Finish By, Start On or After, Adding Notebook Topics, Additional Constraints: Start On, Start On or Before, Finish On, Finish On or Before, Finish On or After, As Late as Possible, Mandatory Start and Finish.
Chapter-15:Resources and Costs
Adding a Resource: Labor, Non-Labor, and Material. Resource Price, Material Unit, Resource calendar, Assigning Resources to activities, View Resource Curves, BudgetedLabor cost, BudgetedNon-Labor cost, Budgeted Material cost, Budgeted Total cost.
Chapter-16:Resource Over allocation, Resource Leveling.
Chapter-17:Activity Codes
Creating Activity Codes, Assigning Activity Codes to Activities, Viewing Activities as Per Activity Codes.
Chapter-18:Project Codes
Creating Project Codes, Assigning Project Codes to Projects, Viewing Projects as Per Project Codes.
Chapter-19:Baselining the Project Plan
Creating a Baseline, Assigning a Baseline, Displaying Baseline Bars.
Chapter-20:Updating a Project
Update Progress, Data Date, Entering Actuals,Statusing Activities to Completion, Statusing Activities in Progress, Entering Activity %completion.
Chapter-21:Earned Value Analysis
Planned Value Cost, Earned Value Cost, Actual Cost, Schedule Variance, Schedule Performance Index, Cost variance, Cost Performance Index.
Chapter-22:Reporting Performance
Running an Existing Report, Print Preview, Page Setup, Printing Reports. Report Wizard, Creating a Report with the Report Wizard, Saving a Report
Chapter-23:Import/Export
Exporting the Report, Exporting the Project, Importing the Report, Importing the Project. TEKLA STRUCTURE FUNDAMENTALS
MX ROAD DESIGN
ADD ON
ADD ON
CANAL TRANING
WATER TREATMENT PLANT TRANING
STOP DAM TRANING
NAVIWORKS
SAFE
ESTIMATION
RCDC
Reviews
There are no reviews yet.